|
|
 |
Title: Lennox - G26 Unit Series
Price: $15.00
Item Number: M1016
Manufacturer: Lennox
Description: Lennox - G26 Unit Series
Table of Contents
- SPECIFICATIONS
- BLOWER PERFORMANCE DATA
- INTAKE and EXHAUST PIPE VENTING TABLE
- GAS PIPE CAPACITY
- G26-3 THROUGH -6 COMPONENTS
- G26 HEAT EXCHANGER
- G26 GENERAL PARTS ORIENTATION
- MAKE-UP BOX INSTALLATION
- I-UNIT COMPONENTS
- A-Make-Up Box
- B-Control Box Components
- II-PLACEMENT AND INSTAllATION
- A-PVC Joint Cementing Procedure
- B-Venting Considerations
- III-START-UP
- A-Preliminary and Seasonal Checks
- B-Heating Start-Up
- C-Safety or Emergency Shutdown
- D-Extended Period Shutdown
- IV-HEATING SYSTEM SERVICE CHECKS
- A-A.G.A./C.G.A. Certification
- B-Exhaust C02 and CO content
- C-Gas Piping
- D- Testing Gas Piping
- E-Testing Gas Supply Pressure
- F-Check Manifold Pressure
- G- Proper Gas Flow (Approximate)
- H-High Altitude Derate
- I-Flame Signal
- V-TYPICAL OPERATING CHARACTERISTICS
- A-Blower Operation and Adjustment
- B- Temperature Rise
- C-External Static Pressure
- D-Blower Speed Taps leadless Motors
- E-Blower Speed Taps Leaded Motors
- VI-MAINTENANCE
- A-Filters
- B-Cleaning Heat Exchanger and Burners
- C-Supply Air Blower
- D-Electrical
- E-Intake and Exhaust Lines
- F-Insulation
- G-Winterizing and Condensate Trap Care
- VII-WIRING DIAGRAM, SEQUENCE OF OPERATION &TROUBLESHOOTING
- A-Field Wiring, Thermostat Connections
- B-Wiring Diagram G26
- C-Heating Sequence of Operation
- D- SureLight Control Trouble Shooting Guide
- E- G26 -1 and -2 Models
- F-BCC2 Blower Control -1 and -2 Models
- G-G77 Ignition Control -1 and -2 Models
- Lennox Engineering Data
Models: G26Q2-50 G26Q3-50 G26Q3-75 G26Q4/5-75, G26Q3/4-100, G26Q4/5-100, G26Q3/4 – 125, G26Q4/5-125
Login to purchase
|
|